  • m.v. Golden Shea - Damaged Section in No 6 Cargo Hold Repaired Under Class BV
Recent project

m.v. Golden Shea - Damaged Section in No 6 Cargo Hold Repaired Under Class BV

05.11.19

Golden Shea cargo hold repair

Staging erected at height to access the damaged area where temporary repairs was done by welding doubler on the punctured area. The doubler area gas cut to size 500mm x 500mm.

New workshop supplied E-350 Grade steel gas cut to size and using standard repair procedure, inserted with the appropriate steel plate after proper V was done and welded. Back gouging by grinding shown to shipstaff. DP Test done in presence of shipstaff.

Class approved Welders for E-7018 consumable used for the job. Class approved Welding Electrodes E-7018 of ESAB make used for welding.